This week has been a busy week. All of the hardwood and most of the tile was laid. The stairs, railing, and banister was constucted. Finally, the exterior brick was finished.
As you can see the sheetrock has been hung. They are in the process of mudding and sanding. Hopefully, the sheetrock will be completely finished by the end of next week. The next stage will be laying the hardwood and tile. The cabinets should be ready by the time the flooring is finished.
Almost finished with the brick! Electrical, plumbing, and heat/air are now complete. They are also finished with insulation and will begin sheetrocking this week.
A lot has happened on the inside of the house since the last post. All of the plumbing and electrical work is complete. The heating and air ducts are also installed. Last week they delivered the staircase and almost took out the front door in the process. Outside, the brickwork is about 70% complete and we have added our front door. The next phase will be the insulation followed by the sheetrocking which we hope to start after Christmas.
The past 10 days we have been dealing with the cold weather. The brick layers have worked when weather has permitted. The right side of the house is now fully bricked and they are starting on the back. Tuesday, the electricians began the rough wiring and the plumber is suppose to start the rough plumbing any day.