Saturday, December 20, 2008

12/20-Update

A lot has happened on the inside of the house since the last post. All of the plumbing and electrical work is complete. The heating and air ducts are also installed. Last week they delivered the staircase and almost took out the front door in the process. Outside, the brickwork is about 70% complete and we have added our front door. The next phase will be the insulation followed by the sheetrocking which we hope to start after Christmas.






Thursday, December 4, 2008

Beating The Cold

The past 10 days we have been dealing with the cold weather. The brick layers have worked when weather has permitted. The right side of the house is now fully bricked and they are starting on the back. Tuesday, the electricians began the rough wiring and the plumber is suppose to start the rough plumbing any day.