Saturday, December 20, 2008

12/20-Update

A lot has happened on the inside of the house since the last post. All of the plumbing and electrical work is complete. The heating and air ducts are also installed. Last week they delivered the staircase and almost took out the front door in the process. Outside, the brickwork is about 70% complete and we have added our front door. The next phase will be the insulation followed by the sheetrocking which we hope to start after Christmas.