Thursday, May 14, 2009

May 14, 2009 - Getting Closer!!!

We are about 2 weeks from completion!! Despite our Brick layer being in jail and our heat/air guy quitting to morn his divorce, we are almost there. Since our last blog, they have finished painting the house and most of the trim; finished the cabinets, countertops, and installed appliances; finished plumbing; hung the lights; and poured our driveway, sidewalks, and porch. Today they finished the hardwood floors. There are still a few things like closet shelving, door hardware, carpet and a few details to take care of. It looks like we are going to survive the house building process! We hope to move in June 6th.




Tuesday, April 7, 2009

April 5, 2009 Pictures

Bookcase in Great Room

Master BR





Wednesday, March 25, 2009

3/25/09 Pictures

Kitchen cabinets
Island that will go in the kitchen
Built-in bookshelves in greatroom

Clay's Room
Back Deck

Master Bedroom



Saturday, March 14, 2009

3/15/09 Updated Pictures

This week has been trim, tile, and cabinet week.








Sunday, March 8, 2009

3/8/09 UPDATE

This week has been a busy week. All of the hardwood and most of the tile was laid. The stairs, railing, and banister was constucted. Finally, the exterior brick was finished.

Upstairs Banister
Staircase


Hardwood in master bedroom


Friday, February 20, 2009

Update 2/15/09

The exterior is almost finished. This week the siding was put on and painted.
The garage doors were installed.


Inside the sheetrock has been hung and mudded. This is a view from the upstairs balcony down into the great room.
This is looking from the great room to the upstairs balcony.
The siding on the rear has to be painted. Rear garage door was installed and the columns on the deck are half bricked.

Wednesday, February 4, 2009

February 4, 2009

As you can see the sheetrock has been hung. They are in the process of mudding and sanding. Hopefully, the sheetrock will be completely finished by the end of next week. The next stage will be laying the hardwood and tile. The cabinets should be ready by the time the flooring is finished.

Master Bedroom

Dining Room

Kitchen

Sunday, January 11, 2009

January 11, 2009

Almost finished with the brick! Electrical, plumbing, and heat/air are now complete. They are also finished with insulation and will begin sheetrocking this week.

Saturday, December 20, 2008

12/20-Update

A lot has happened on the inside of the house since the last post. All of the plumbing and electrical work is complete. The heating and air ducts are also installed. Last week they delivered the staircase and almost took out the front door in the process. Outside, the brickwork is about 70% complete and we have added our front door. The next phase will be the insulation followed by the sheetrocking which we hope to start after Christmas.






Thursday, December 4, 2008

Beating The Cold

The past 10 days we have been dealing with the cold weather. The brick layers have worked when weather has permitted. The right side of the house is now fully bricked and they are starting on the back. Tuesday, the electricians began the rough wiring and the plumber is suppose to start the rough plumbing any day.

Tuesday, November 25, 2008

November 25, 2008

Since the last post we have almost finished the interior framing, set the windows and most of the doors, and began bricking.




Sunday, November 16, 2008

We have a roof!

Despite bad weather, we were able to get a lot accomplished this week. The roof was sheeted and then prepared for shingles. The roof over the front porch was built, the back deck was framed, and much of the remaining interior was framed. The last picture is the great room fireplace.

Wednesday, November 5, 2008

November 5, 2008

November 5-Half way finished framing the roof.